Product Search
Color search
Graboplast Contact
Contact Head office

Central site
Tatabánya
Kecskemét
 

OratoronyGraboplast started its operation at its current site in Győr more than 110 years ago.

 

The factory in Győr renewed in 2008 was one of the leading plants of the national plastic industry in the last century, as this was the only place where artificial leather and PVC floors were manufactured.

 

The company started the PVC floor manufacture at its site in Győr more than forty years ago, which also means that it has acquired traditional manufacturing experiences in that field in Europe.


Today, the plant in Győr fundamentally settled down for the manufacture of PVC floors and that is where the world standard sports, commercial, show and vehicle floors are made.

 

Graboplast intends to follow the road on which it started in the last decade: to increase its market share as a key European special floor manufacturer by reaching a growth beyond the average in the field of new floor types.

 

 

 

  • H-9023 Győr, Fehérvári u. 16/b.
  • GPS coordinates of the head offices: 47.681799, 17.655705
  • GPS coordinates for tracks: 47.681931, 17.650201

If you have any questions or comments, This e-mail address is being protected from spambots. You need JavaScript enabled to view it

 

 

Click to truck chart!



View larger map

Tatabánya

pic tatabanya 2

In addition to the world class PVC floor factory of Graboplast built in Tatabánya in 1998, the company erected a new Grabo Design Floor Factory by 2016.

 

Beyond the traditional PVC floors, LVT (Luxury Vinyl Tile) made with a brand new technology and non-directional homogeneous floor covers are manufactured in Tatabánya, the worldwide sales of which have increased by more than 10 percent.


Graboplast has been processing the PVC wastes generated during its production activities in Tatabánya since 2013 in the light of environment consciousness by making recyclable PVC granulate with specific grinding machines for its own purposes.

According to our intentions, reprocessing may soon involve PVC wastes purchased from other companies.

 

The use of environment-conscious technologies is particularly important for Graboplast, and therefore a significant part of the wastes generated during the manufacture is processed in-house in an environment-friendly and cost-efficient way.

 

  • H-2800 Tatabánya, Vigadó u. 1.
  • GPS coordinates:  47.543881, 18.427913

If you have any questions or comments, This e-mail address is being protected from spambots. You need JavaScript enabled to view it

 

 

 


View larger map

 

Kecskemét

pic kecskemet

Real wooden flooring was a new product on Graboplast’s range when it purchased the parquet factory of Kecskemét in 1997.

 

The parquet factory of Kecskemét is a company with 40 years of experience in production. By building upon this professional culture, Graboplast Ltd. created a new investment in the Kecskemét factory in a response to customer demands. The new 3strips 3 layers engineered wooden parquet production line was launched in 2000, which meets European standards in terms of technology and is the most up-to-date of its kind in Central Europe.

Real wooden engineered parquet became a successful product by creating a high demand in 2005, which in turn induced another capacity increase investment. Having finished the increasement, the factory now has the capacity to produce almost 2 million square meters of flooring.

  • H-6000 Kecskemét, Halasi u. 10.
  • GPS coordinates: 46.89391, 19.686706

If you have any questions or comments, This e-mail address is being protected from spambots. You need JavaScript enabled to view it  



View larger map

 
Back to the top SitemapProtection of personal dataImpressions

Webdesign:

R-BIS